The footings for the new Fitness Centre are being prepared today and should be poured early next week.  After curing the existing Admin Building (below) on the waterfront will be moved onto the foundation.  This building was designed to become the Fitness Centre with the large windows on the front overlooking the pool.  There will be both an indoor and outdoor shower when it’s completed.

Admin Bldg will be moved soon